Fire protection projects often involve more than one system, one trade or one stage of work.
“Control Fire look after the fire inspections at my building have always been reliable, professional, and easy to deal with”. – Kira H
A building upgrade may affect sprinklers, detection, passive fire, fire doors, dampers and emergency lighting at the same time. A Council Fire Safety Order may require several separate measures to be upgraded. A refurbishment may uncover existing defects that were not visible when the original scope was prepared.
Control Fire Protection delivers fire protection projects across existing buildings, refurbishments, upgrades and construction environments, coordinating multiple fire systems where required.
From initial scope review through to installation, testing, rectification and handover, CFP helps keep the project moving through one coordinated team.
Successful fire protection projects depend on coordination. Before works begin, there may be drawings to review, existing building conditions to confirm, fire engineering requirements to understand, other trades to coordinate, access restrictions, shutdowns, materials, programme constraints, existing defects, variations, testing requirements and closeout documentation. CFP’s approach is to understand these requirements before they become site problems.
One Project. Multiple Fire Systems.
A single building project may require sprinkler alterations because ceilings have changed, detection devices to be relocated, new ductwork requiring dampers, new services penetrating fire-rated construction, fire door changes, emergency lighting alterations and testing across several systems.
Using separate contractors for each element can create multiple handovers and unclear responsibility at the interfaces between trades.
CFP can coordinate multiple fire systems through one project team, helping simplify those interfaces for the client.
Projects in existing buildings require a different approach to new construction. Drawings may not match what is installed. Services may have been altered over many years. Existing fire systems may be ageing or undocumented.
CFP can assist with existing system investigation, condition assessment, defect identification, upgrade scoping, staged rectification, system modifications, replacement of ageing equipment, coordination around occupied areas and testing following alterations.
Changes to walls, ceilings, services and room layouts can affect sprinkler coverage, detection, emergency lighting, exit signage, fire-rated construction, service penetrations, dampers, fire doors and paths of travel.
CFP can review these fire protection interfaces during the project and coordinate required alterations alongside the builder and other services.
Where a property has accumulated significant fire safety defects, the work may be better managed as a structured upgrade program rather than isolated repairs.
CFP can organise larger scopes by fire safety measure, building, level, area, priority, access requirement, project stage, budget and programme.
01 - Review
Review architectural drawings, fire engineering reports, hydraulic drawings, mechanical drawings, detection documentation, Fire Safety Schedules, defect reports, Fire Safety Orders, specifications, tender documents, existing system information, site conditions and programme requirements.
02 - Plan
Plan site inspections, scope confirmation, work sequencing, materials, access, shutdowns, high-level access, after-hours work, occupied-area restrictions, trade coordination, documentation and testing requirements.
03 - Coordinate
Work alongside builders, developers, mechanical contractors, hydraulic contractors, electricians, fire engineers, consultants, facility managers, strata managers, architects and other fire protection contractors.
Where design or engineering is required, CFP coordinates with appropriately qualified external providers; design is not represented as an in-house CFP function.
04 - Deliver
Project delivery may involve one specialist fire service or several working together, including passive fire, dampers, fire doors, detection, wet fire, emergency lighting and portable equipment.
05 - Test & QA
Depending on the project, this can include functional testing, flow and pressure testing, pump testing, detection testing, interface testing, damper testing, fire door operational checks, passive QA, emergency lighting testing and defect review.
06 - Handover & Closeout
Closeout may include test results, commissioning information, photographs, passive installation records, product information, defect closeout, asset information, system information, outstanding-item registers and supporting certification documentation.
CFP was engaged to complete a fire protection upgrade within an existing occupied building where several systems required rectification.
The scope included wet fire alterations, detection works, passive fire rectification, fire door defects and damper-related works.
Rather than requiring the client to independently coordinate several specialist contractors, the fire protection requirements were broken into defined work packages and coordinated through CFP’s relevant divisions.
Works were staged around building access and system shutdown requirements, with affected systems progressively tested and completed areas documented.
The client had one fire protection team coordinating multiple fire systems and a clearer pathway from the original defect scope through to project handover.
CFP was engaged as part of a commercial refurbishment where changes to walls, ceilings and building services affected several existing fire systems.
New mechanical services required damper coordination and passive treatment, electrical and data services created new fire-rated penetrations, and changes to the tenancy layout required alterations to sprinklers, detection and emergency lighting.
CFP coordinated the fire protection interfaces with the builder and relevant trades as the project progressed.
By addressing the systems together during construction, the client reduced the risk of completing the fit-out only to discover multiple fire compliance issues during final inspection.
Answers to common questions about fire protection projects and upgrades. If you can’t find what you’re looking for, send us an enquiry and our team will be in touch.
CFP can plan project works around residents, tenants, patients, aged-care residents, students, retail customers, hotel guests, warehouse operations, public access and production environments.
Where required, CFP considers the scope of the isolation, affected areas, building operations, other contractors, required notifications, controls during impairment, testing before reinstatement and confirmation of system restoration.
Where existing-building projects uncover unexpected conditions, CFP aims to identify what has changed, why it affects the original scope, what additional work is required, programme impact, cost impact and any effect on other fire systems or trades.
“Control Fire Protection has consistently demonstrated their expertise, professionalism and commitment to excellence. Their prompt and reliable service has ensured the safety and compliance of our facilities at all times. I wholeheartedly recommend them.”
Coffey Engineering Group
Send us your drawings, tender documentation, fire engineering report, defect register, Fire Safety Order, consultant report, scope of works or existing system information.